CTO Services Process

Our Method For Success

By Jason Booher - Founder, Solution Architect

Our CTO Services Process

A repeatable, two-phase process that turns leadership goals into shipped, measurable outcomes.

How the Process Is Structured

Our CTO Services engagement runs as a two-phase, six-step process. The first phase is about understanding the business and defining what success looks like. The second phase is about executing against that definition and keeping it on track over time.

Each phase contains three sequential steps:

Phase 1: Plan

Step 1: Define Success.
Step 2: Deep Discovery.
Step 3: Define KPIs.

Phase 2: Execute

Step 1: Implement Priority 1.
Step 2: Iterate.
Step 3: Maintain.

The two phases are not strictly linear in practice. As soon as Phase 2 begins, real production data starts feeding back into the Plan phase. Goals get refined, priorities shift, and the KPI cadence drives the next round of work.

Phase 1: Plan

Three steps that align leadership, surface the real status quo, and set the measurements that matter.

Step 1: Define Success

Before we touch a single piece of technology, we sit down with leadership and answer the question, “What does success look like over the next twelve months, and what is in the way of getting there?” The output of this step is a written, agreed-upon definition of success that drives every priority decision after it.

Leadership Strategy Meetings

Working sessions with the executive team to align on business strategy, technology direction, and the outcomes the leadership team is held accountable for.

Goal Setting

Translating strategy into specific, measurable goals with clear owners. Each goal is paired with a concrete indicator of completion so progress is never ambiguous.

Prioritization

Ranking the goals against effort, impact, and dependencies. The output is a single, ordered backlog that everyone agrees represents the real priorities of the business.

Step 2: Deep Discovery

Leadership rarely has a complete picture of how work actually gets done day to day. Step 2 closes that gap. We interview the people who run the system every day, document what is really happening, and surface the differences between the leadership view and the operational reality.

Manager Meetings

Structured conversations with the people running each functional area. We learn what their team is responsible for, what blocks them, and what would change their week if it were fixed.

Super User Input

The power users inside the system know things that no executive briefing will ever capture. We bring them into the process directly, because their feedback turns into the highest-leverage changes.

Status Quo Analysis

A clear-eyed write-up of how the technology stack actually works today: what is in use, what is shelfware, what is held together with workarounds, and what is genuinely strong. This becomes the baseline for everything we measure against later.

Step 3: Define KPIs

A definition of success without measurements becomes an opinion. Step 3 turns the goals from Step 1 into the indicators that will show whether the work in Phase 2 is moving the business or just moving pixels.

Define Key Performance Indicators

For each priority goal, we name the specific metric that proves it is being met, the data source that produces it, and the threshold that separates “on track” from “off track.”

Reporting Strategy

We design how each KPI will be reported, who consumes it, and how it surfaces inside the existing tools so the leadership team is not chasing data across a dozen places.

Cadence Setting

Reports are only useful if someone actually reads them on a known schedule. We set a review cadence (weekly, monthly, quarterly) and the standing meeting that consumes each one.

Phase 2: Execute

Three steps that ship the highest-priority work, learn from real users, and keep the system healthy long term.

Step 1: Implement Priority 1

We start with the single highest-priority item from the prioritized backlog and ship it end to end. Starting narrow keeps the team honest, gives leadership an early visible win, and proves the planning work from Phase 1 actually translates into delivery.

Create the Implementation Team

We staff the right combination of WSM resources and client team members for the specific scope of Priority 1. Roles, responsibilities, and decision rights are documented before any work begins.

Build and Test

The build runs through the WSM DevOps pipeline (development, merge testing, fit testing) so every change is human-validated before it can reach production. AI-assisted work follows the same gates.

Deploy

Production deployment is a 100% human action, performed against the staging-validated package. The GitHub repo is the source of truth, so rollback is always available if it is ever needed.

Step 2: Iterate

Real users generate real feedback the moment they touch a release. Step 2 turns that feedback into the next round of changes, ranked against the same priority framework that produced the first round.

User Feedback

Structured collection of what is working, what is not, and what users wish the system did. This is captured in a single channel so nothing gets lost in side conversations.

Prioritize Changes

Every piece of feedback gets ranked against impact, effort, and the goals from Phase 1. The result is an updated, ordered backlog that the leadership team has visibility into.

KPI Status Analysis

We check the KPIs defined in Phase 1 against current reality. If a KPI is off track, that becomes its own priority. If a KPI is consistently green, we revisit whether the bar is set in the right place.

Step 3: Maintain

A healthy system needs ongoing care, not just project pushes. Step 3 establishes the ongoing operational footprint so the wins from Phase 1 and from earlier rounds of Phase 2 keep compounding instead of decaying.

Create the Maintenance Team

We staff a small, defined team responsible for the ongoing health of what has shipped. The team has clear ownership, a clear queue, and clear escalation paths.

Reporting Strategy (Operational)

We move the reporting strategy defined in Phase 1 into a stable operational format that the maintenance team owns. Dashboards, alerts, and exception reports are documented and assigned.

KPI Reporting

The KPIs run on the cadence set in Phase 1, in front of the standing meetings that own them. The CTO services engagement keeps the leadership team accountable to the same indicators they helped define.